Upgrading of State Road B20 to From The Eastern Access to Kuala Lumpur International Airport – Package 1A | 1996 | Bina Puri Panzana Consortium JV (Design & Build) | Rehabilitation and Upgrading of 7 KM of Road From Two Lane Single Carriageway to Two-Lane Dual Carriageway & Reconditioning 4 KM of Main Access Road Inclusive of Road Alignment, and Drainage, Multi-Span Bridges Over Road and Rail, Geotextile Reinforced Pile Embankment, Relocation of Service and Road Furniture. |
Upgrading of State Road B20 to From The Eastern Access to Kuala Lumpur International Airport – Package 1B1 | 1997 | Bina Puri Panzana Consortium JV (Design & Build) | Rehabilitation and Upgrading of 4 KM of Road From Two Lane Single Carriageway to Two-Lane Dual Carriageway-Design Road Alignment, Drainage, Pre Consolidation With PVD & Surcharge Embankment. |
Upgrading of State Road B20 to From The Eastern Access to Kuala Lumpur International Airport – Package 1B2 | 1999 | Bina Puri Panzana Consortium JV (Design & Build) | Geometric Design for 7 KM New Alignment Two-Lane Dual Carriageway Including One Trumpet Interchange, One Directional Ramp, Elevated Structures and Surcharging. |
Upgrading of Federal Route 8 From Kuala Lipis to Kampung Relung, Pahang | 2000 | MOLOP Corporation Sdn Bhd (Design & Build) | Geometric Design of Realignment and Improvement Of Existing Hilly Terrain Road To PUBLIC WORKS DEPARTMENT R5 Standard With Deep Cuts and High Embankment. |
Hill Road from Bertam Valley to Ringlet, Cameron Highlands, Pahang – Package 4 | 2001 | TAZAL Corporation Sdn Bhd (Design & Build) | Geometric Design Of New and Re-Alignment for a 19 KM Mountainous Terrain Road to PUBLIC WORKS DEPARTMENT R3 Standard Including 5 Single and Multi-Span Bridges, Extensive Slope Treatment and Rigid Pavements. |
Upgrading of Jalan Kedai Buloh – Kuala Besar, from Simpang Empat Kedai Buloh to Jalan Pengkalan Chepa, Kelantan – Phase IV | 2002 | Public Works Department Malaysia | Design of Two Lane Single Carriage Road From Simpang Empat Kedai Buloh to Pengkalan Chepa and Two Lanes Dual Carriageway From Pengkalan Chepa to Jalan Nangka Including Geometric Design of Road Alignment, Drainage and One Multi Span Bridge |
Proposed Additional Ingress & Egress From Megasteel to B18/B20, Banting, Selangor | 2002 | Megasteel Sdn Bhd | Geometric Design to Improve Main Egress and Ingress for Megasteel Industrial Complex |
Feasibility Study and Detailed Project Report for Four Laning of Thrissur to Angamali, NH-47, KM 270.000 to KM 316.700 Under Programme of North-South and East-West Corridors – Phase III | 2002 | National Highways Authority of India | Survey, Testing and Geometric Design of Existing Road to Four Lane Divided Carriageway to be Upgraded As Toll Expressway in The State of Kerala, India |
Upgrading of Approach Road and Timber Bridge at Jalan Kg. Melayu Sempalit, Raub, Pahang | 2003 | Public Works Department Malaysia | Geometric Design of 5.25 KM of Road Realignment to PUBLIC WORKS DEPARTMENT R3 and Replacement of Timber Bridge. |
Localised Widening to Lebuh Raya Damansara – Puchong (LDP) South Bound From KM 0.8 to KM 1.9 | 2005 | Lingkaran Trans Kota Sdn Bhd (LITRAK) | Geometric Design of For Additional Laning and Widening for Toll Highway. |
Main Access to Pembangunan Orchard Circle Sdn Bhd on Lot 86302 & 2630, Kajang, Selangor | 2006 | Orchad Circle Sdn Bhd | Geometric Design Of Ingress and Egress From SILK Toll Expressway to Proposed Mixed Development |
Road Upgrading from Donggongan to Simpang Jalan Papar Spur, Kota Kinabalu, Sabah | 2006 | Perunding Gah Padu | Geometric Design For a 4 KM Two-Lane Dual Carriageway Urban Road Including a Multi-Span Bridge |
Kuala Lumpur – Kuala Selangor Toll Expressway – Package 2 | 2008 | Kuala Lumpur – Kuala Selangor Expressway Consortium Ltd | Geometric Design for a 4 KM Two-Lane Dual Carriageway Urban Road Including a Multi-Span Bridge. |
Proposed Enhancement to Lebuh Raya Damansara- Puchong (LDP) | 2009 | Lingkaran Trans Kota Sdn Bhd (LITRAK) | Geometric Design of 17 KM Toll Expressway, Two Interchanges, 14 Bridges Over Road, River & Rail, 15 Vehicular Box Culverts From Kundang to Templer Park, Selangor. |
Consultancy Services for The Proposed Dedicated Left Turn Lane and Contra Flow Traffic Light Phasing | 2010 | SPRINT Sdn Bhd | Consultancy Services for Detailed Design for Improvement Works on Highway. |
Proposed Amendment to Layout Plan to Convert Residential Land to Industrial on Lot 68738 & 68739, Mukim Klang, Daerah Klang, Selangor | 2010 | Park Vista Development Sdn Bhd | Consultancy Services for Design of Intersection for Industrial Development Site. |
Feasibility Study 100 KM Toll Highway Dar-Er- Salaam to Chalinze, Tanzania | 2012 | Versatile Creative Bhd | Preliminary Alignment Proposal for Toll Expressway |
Cadangan Jalan Susur KeluarBertol Dari Lebuhraya KL-Kuala Selangor Ke Laluan B149 Kundang | 2013 | LATAR Berhad | Design Consultancy Services for Construction of East / West Bond Exist Ramp and Toll Plaza at Kundang for LATAR Expressway |
Conceptual Design at UKAS for The Proposed New Expressway Between Cheras and KLIA | 2013 | Grand Saga Sdn Bhd | Design Consultancy Services for Expressway Preliminary Design and Engineering |
Projek Penswastaan Lebuhraya Bertingkat Sungai Besi – Ulu Kelang | 2014 | DZI Consult Sdn Bhd | Consultancy Services for Toll Expressway Alignment and Drainage SUKE Package B7 |
Proposed Refurbishment and Upgrading Existing Toll Plaza at Sepadu Highway, Kelang Selangor | 2015 | Grand Sepadu (NK) Sdn Bhd | Consultancy Services for Toll Road Geometric Alignment Enchancements to Sepadu Highway |
Proposed New Access To NNKSB For The Improvement of Connection to The Local Network At Jalan Haji Sirat, Jalan Rantau Panjang and Teluk Kapas | 2016 | Grand Sepadu (NK) Sdn Bhd | Geometric and Structural Design For Signages Grand SepaduToll Expressway (E25) |
Projek Penswastaan – Lebuhraya Bertingkat Damansara – Shah Alam
Package CA4: Construction & Completion of Mainline & Other Associated Works From CH.4983 to CH.9307 |
2016 | Panzana Enterprise Sdn Bhd | GeometricDesign Services for Viaduct Super-structures. |
Proposed for Design of Civil & Structural Engineering Mechanical & Electrical Engineering Consultancy Services & Supervision Works Additional Toll LAmbes & Boths at KApar East Bound Toll Plaza (NNKSB) |
2020 | Grand Sepadu (NK) Sdn Bhd | Highway Design For Upgrading of Toll Lanes At The Approval & Extension of TollBooths & Associated Civil Works. |
As-Built Survey Jalan Susur Keluar Bertol dari Lebuhraya KL-Kuala Selangor (LATAR) ke Laluan B149 Kundang, Selangor |
2022 | KL Kuala Selangor Expressway Berhad | Preparation of As-Built Survey and Drawings for Kundang Toll Plaza |
Geometric Design for External Road Linking FT 54, Damansara Damai |
2024 | Parkwood Holdings Sdn Bhd | Geometric Design Services for External Road Linking FT 54, Damansara Damai |