| YEAR |
CLIENT |
PROJECT TITLE |
BRIEF DESCRIPTION OF WORKS |
| 1998 |
Public Works Department Negeri Sembilan. |
Replacement of bridge No. 7/7 on Port Dickson-Linggi Road on Route N8 and bridges No. 4/3 & No. 3/6 on Rantau-Siliau Road on Route N6 in Port Dickson District, Negeri Sembilan.
|
Design single span bridge to replace box culvert and existing sub-standard bridges.
|
| 1999 |
Public Works Department Negeri Sembilan. |
Replacement of bridges No. N17/001/20 & N17/004/20 on Jelai - Dangi Road on Route N17, in Kuala Pilah District, Negeri Sembilan.
|
Design of single span bridge as replacement for existing narrow bridges.
|
| 2000 |
Public Works Department Pahang. |
Replacement of existing timber bridge at Kg. Sg. Tras, Raub, Pahang.
|
Design of single span bridge to replace existing timber bridge.
|
| 2003 |
Public Works Department Pahang. |
Replacement of timber bridge at Kg. Paya Pelantar, Bentong, Pahang.
|
Design of road realignment and upgrading of existing timber bridge to a 24 meter span concrete bridge.
|
| 2004 |
Public Works Department Pahang. |
Upgrading of existing road and construction of new bridge at Tg. Gahai, Kuala Lipis, Pahang.
|
Geometric design of upgrading of existing road to PWD R5 standard including the design of a 150 meter long 5 span bridge over Jelai river.
|
| 2007 |
MMC-Gamuda JV
Sdn. Bhd.
|
Proposed Electrified Double Track Project, Ipoh to Padang Besar.
- Road Over Bridge (ROB)
|
Geometric and structural design consultancy services for the construction of four (4) Nos of Road Over Bridge for double railway tracking works.
|
| 2011 |
JKR Pulau Pinang |
Cadangan Pembinaan Jambatan Menggantikan Pembetung Sediada Kepada Jambatan Konkrit Di Jalan Tanah Liat, Daerah Seberang Perai, Tengah Pulau Pinang. |
Geometric and structural design consultancy services for the replacement vehicular box culvert. |